SITE PREPARATION WORKS
Covered area: 25000 m2
CIVIL WORKS
Rebars Frame - Works Concrete - Works
TANK FABRICATION
Fabricated & installed tanks: 15 items
Capacity: 7 items (16m3), 6 items (10m3), 2 items (4m3)
STEEL STRUCTURE WORKS
Supplied material: 2900 ton
Supplied services:
- Design
- Material Supply
- Fabrication
- Shipping
- Installation
- Technical Procurement
STEEL STRUCTURE WORKS
EQUIPMENT INSTALLATION
- Installation of pumps
- Installation of overhead crane
- Installation of Appron feeder
- Installation of belt conveyer
- Installation of crusher
- Installation of Sagmill
- Installation of Ballmill
- Installation of Diesel Generator
ELECTRICAL WORKS
Distance: 30 km PIPING
Waste Water PIPELINE Transmission
Welding, laying down, bolt up and testing the Slurry pipe
from the agitation leaching plant to The tailing dam in Soyudlu
Slurry Pipeline Length: 14 Km Reverse line 7 km. Diameter 200 mm, 600 mm, 800 mm
Material Polyethylene: Pipe
Transmission Method: Pumping System
Number of Pumping station: 1
PRE – COMMISSIONING & COMMISSIONING
- Pre – Commissioning and Commissioning of Pumps
- Pre – Commissioning and Commissioning of Diesel Generator
- Pre – Commissioning and Commissioning of Appron Feeder
- Pre – Commissioning and Commissioning of Crusher
- Pre – Commissioning and Commissioning of Belt Conveyer
- Pre – Commissioning and Commissioning of Sagmill
- Pre – Commissioning and Commissioning of Ballmill
- Pre – Commissioning and Commissioning of Overhead crane