GEDABEK AGITATION LEACH PLANT

 

GEDABEK AGITATION LEACH PLANT, Azerbaijan, Baku

Client

Azerbaijan International Mining Company

Location

Gedabek, Azerbaijan.

 

SITE PREPARATION WORKS

Covered area: 25000 m2

CIVIL WORKS

Rebars Frame - Works Concrete - Works

TANK FABRICATION

Fabricated & installed tanks: 15 items

Capacity: 7 items (16m3), 6 items (10m3), 2 items (4m3)

   

 STEEL STRUCTURE WORKS

   Supplied material: 2900 ton

   Supplied services:

  •     Design
  •      Material Supply
  •      Fabrication
  •      Shipping
  •      Installation
  •      Technical Procurement


  

STEEL STRUCTURE WORKS

 EQUIPMENT INSTALLATION

  •       Installation of pumps 
  •       Installation of overhead crane
  •       Installation of Appron feeder
  •       Installation of belt conveyer
  •       Installation of crusher
  •       Installation of Sagmill
  •       Installation of Ballmill
  •       Installation of Diesel Generator

ELECTRICAL WORKS

     Distance: 30 km PIPING

Waste Water PIPELINE Transmission

Welding, laying down, bolt up and testing the Slurry pipe

from the agitation leaching plant to The tailing dam in Soyudlu

Slurry Pipeline Length: 14 Km Reverse line 7 km. Diameter 200 mm, 600 mm, 800 mm

Material Polyethylene: Pipe

Transmission Method: Pumping System

Number of Pumping station: 1

PRE – COMMISSIONING & COMMISSIONING

  • Pre – Commissioning and Commissioning of Pumps
  • Pre – Commissioning and Commissioning of Diesel Generator
  • Pre – Commissioning and Commissioning of Appron Feeder
  • Pre – Commissioning and Commissioning of Crusher
  • Pre – Commissioning and Commissioning of Belt Conveyer
  • Pre – Commissioning and Commissioning of Sagmill
  • Pre – Commissioning and Commissioning of Ballmill
  • Pre – Commissioning and Commissioning of Overhead crane

View the embedded image gallery online at:
http://azco.az/index.php/en/projects/gedabek#sigFreeId609f1c829e