MERCHANT HOTEL PROJECTS
- Client: Construction
- Baku, Azerbaijan
Supplied services:
1. Initial Inspection and Structural Design
- Site inspection by a structural engineer
- Assessment of load-bearing walls and columns
- Designing the new steel roof system (based on spans, loads, and codes)
2. Demolition and Removal of the Wooden Roof
- Removal of all objects and finishes from the existing roof
- Carefully demolish wooden boards, beams, and coverings
- Clear the area and remove debris to prepare for the new installation
Structural Retrofitting
- Reinforcing existing walls and adding steel beams at critical connection points
- Reinforcing old load-bearing elements
Steel Structure Works
- Supplied material: 250 ton
- Design
- Material Supply
- Fabrication
- Shipping
- Installation
- Technical Procurement